ADU Contractor Near Me

Two ADU bids twenty thousand dollars apart usually describe two different projects, not two different prices. This page shows you how to force every bidder onto the same written scope, which line items are most commonly left out of a base bid, and the payment schedule terms that put your money at risk.

Searched 1,300/mo Difficulty 16 Advertisers pay $12.86/click Phone (954) 488-0700

What you actually need to know

The average cost to build an ADU ranges from $150 to $300 per square foot, with total project costs typically falling between $60,000 and $285,000.

Labor costs, including general contractors, electricians, and plumbers, account for approximately 40% of the total ADU project cost.

Material costs make up about 45% to 50% of the total budget, covering lumber, roofing, windows, and finishes.

Design and architectural fees typically consume 10% to 15% of the overall project budget.

Garage and basement conversions are generally the most affordable ADU types, averaging $60,000 to $150,000, as they utilize existing structures.

The rest of it, in plain terms

  • Detached new construction ADUs are the most expensive, rng from $110,000 to $285,000, due to the need for new foundations and separate utilities.
  • Building permits are a significant expense; in California, they average $10 to $12 per square foot, meaning a 750 sq ft ADU could incur $7,500 to $9,000 in permit fees.
  • Essential utility connections (electrical, plumbing, HVAC) average between $3,400 and $10,400, with running electricity alone costing $1,000 to $3,800.
  • California's AB 1033 allows local jurisdictions to permit homeowners to sell their ADUs separately as condominiums.
  • The International Residential Code (IRC) governs ADU building requirements in many jurisdictions, treating them as full dwelling units.

What it costs

Figures below are researched market numbers for budgeting and comparison. They are not quotes. Final pricing depends on your site, your jurisdiction, finish selections, foundation and utility distance.

  • Garage/Basement Conversion: $60,000 to $150,000
  • Detached New Construction: $110,000 to $285,000
  • Attached New Construction: $100,000 to $216,000
  • Material Costs: 45% to 50% of total project cost
  • Design/Architect Fees: 10% to 15% of total project cost
  • General Contractor Fees: 10% to 20% of total project cost
  • Building Permits (California): $10 to $12 per square foot
  • Utility Connections (Electrical, Plumbing, HVAC): $3,400 to $10,400 average
Every number on this page is a budgeting estimate. Site conditions and local fees move them more than anything else. Call (954) 488-0700 for a site-specific figure.

Code and statute

ADU rules are set locally and change often. These are the provisions that most commonly control the outcome. Verify against your own jurisdiction before you design anything.

  • California AB 1033: Authorizes local agencies to adopt ordinances allowing the separate conveyance (sale) of ADUs as condos.
  • California AB 881: Revises requirements to allow ADUs to be attached to or located within an existing primary dwelling or accessory structure.
  • California SB 9: Built upon recent changes to State ADU and JADU laws, making it easier and faster to build ADUs across the state.
  • California AB 68: Part of the package of bills that streamlined ADU permitting and reduced barriers to construction.
  • Massachusetts 760 CMR 71.00: Code of Massachusetts Regulations regarding ADUs.
  • Nevada/IRC: Building code requirements for ADUs are based on the International Residential Code (IRC), as they are considered dwelling units.
  • Providence, RI: One ADU permitted per residentially zoned lot, maximum 900 sq ft for a one-bedroom or studio.
  • Connecticut: ADU must be between 750 sq ft and no more than one-third of the primary home's living area, max two bedrooms.

Reading two bids that look nothing alike

The single most useful thing you can do is force every bidder to price an identical written scope. Without that, you are not comparing prices, you are comparing assumptions. One contractor assumes a slab, another a crawl space. One includes a two-hundred-foot sewer run, another assumes the connection is at the property line. The bids differ by tens of thousands of dollars and neither is dishonest.

Watch the allowance lines specifically. Allowances are placeholder budgets for items not yet selected: flooring, cabinets, fixtures, appliances. A bid with an unrealistically low allowance looks competitive and then reappears as a change order once you pick anything. Ask what the allowance buys in real product terms, and whether it is per square foot or a lump sum.

Payment schedule matters as much as price. A reasonable schedule ties draws to completed milestones with an inspection or verification at each one. Front-loaded schedules that demand a large deposit before mobilization put your money at risk before anything exists on your property. Ten to fifteen percent at signing is normal; forty percent is not.

Bid line items that are commonly excluded

Site survey and soils reportOften required, rarely in the base bid.
Grading, excavation and spoil removalHighly site-dependent and easy to omit.
Utility trenching and connectionCost scales with distance. Measure it before accepting a number.
Impact, plan check and school feesSet by the jurisdiction, not the builder.
Energy compliance documentationRequired in many states, produced by a third party.
Landscaping and hardscape restorationTrenching tears up a yard. Restoration is separate.
Sprinklers or fire suppressionTriggered in some jurisdictions by size or distance.
Utility company connection chargesPaid to the utility, outside the construction contract.

Why this page gives you the numbers

Most pages on this subject put the cost behind a contact form. The reasoning is understandable and the result is that you cannot budget, cannot compare, and cannot tell whether a bid is reasonable until you have already given up your phone number to three companies.

We publish the figures instead. They are researched market ranges rather than quotes, and site conditions will move them more than any other factor, but a range you can plan against beats a call-back you have to wait for. The constraints that decide feasibility — setbacks, height, utility distance, site access — are stated up front for the same reason. If your project is not viable, that is worth knowing on the first visit rather than the third phone call.

Production and timing

Factory production windows move with queue depth, material lead times and seasonal demand. We quote the current window rather than a fixed promise, because anyone promising a specific delivery date months out without seeing the factory schedule is guessing. Permitting is usually the longer pole: in ministerial states the review clock is defined by statute, while in discretionary jurisdictions it can run considerably longer.

The sequence that controls your schedule is site plan, permit submittal, plan check and corrections, permit issuance, factory slot, delivery and set, then utility connection and final inspection. Factory build time overlaps permitting only if you commit to the slot before permits are issued, which carries its own risk.

Questions people ask

How much does it cost to build an ADU?
On average, building an ADU costs between $150 and $300 per square foot. Total costs typically range from $60,000 to $285,000, depending on whether it's a garage conversion, attached addition, or a new detached structure.
Do I need a permit to build an ADU?
Yes, building an ADU requires permits, including building, electrical, and plumbing permits. Permit costs vary by location; for example, in California, they average $10 to $12 per square foot.
Can I sell my ADU separately from my main house?
In some areas, yes. For instance, California's AB 1033 allows local agencies to permit the separate sale of ADUs as condominiums, though this depends on your specific city's adoption of the ordinance.
What is the cheapest type of ADU to build?
Garage and basement conversions are generally the most cost-effective ADUs to build, typically ranging from $60,000 to $150,000, because the primary structure and foundation already exist.
How long does it take to build an ADU?
The timeline varies based on complexity, permitting, and contractor availability. While construction itself might take a few months, the entire process from design and permitting to completion can take 6 to 12 months or more.

Related ADU topics

ADU Contractors Near Me2,400/mo searches · difficulty 14
ADU Builder Near Me2,400/mo searches · difficulty 18
Accessory Dwelling Unit Builders1,300/mo searches · difficulty 26
ADU Plans4,400/mo searches · difficulty 27
ADU Floor Plans1,600/mo searches · difficulty 19
ADU Designs1,600/mo searches · difficulty 23
Modular ADU1,300/mo searches · difficulty 19
ADU Kits880/mo searches · difficulty 13
Detached ADU880/mo searches · difficulty 14

Get a adu contractor near me quote

Tell us the scope and the ZIP. You get a real delivered-and-installed number, not a "contact us for pricing" runaround.

Or call/text (954) 488-0700. Photos and a site address get the fastest confirmed number.